The intervention commissioned has covered the replacement of 3 blades at the height of 85 meters.

For this operation the Marano Group has provided the following equipment:

  • n. 2 cranes – 220 ton;
  • n. 1 platform reaching mt 85

The work was concluded in 2 working daysand was commissioned by Enel Green Power.
When works were concluded, as you can be seen from the images, the repaired areas looked as new.

The repair share was carried out in absolute safety conditions for the men involved and for the equipment.

The operators engaged: Mr Discepolo Bruno

Our staff has worked with professionalism and absolute availability in respect of intervention times provided, allowing the minimum block of the system.

The customer has expressed, according to our questionnaire about the quality, the maximum score provided.
Our Quality office , Environment and Safety at Work has provided the documents required by law and has assured the quality management of the work location.

Throughout the whole duration of the rental, disputes regarding compliance with the safety conditions were not detected by the bodies responsible for monitoring.

There have been neither accidents at work nor emergency situations (despite the presence of strong cross winds).

We haven’t had environmental impact direct or indirect during the work and the waste and debris were stored and disposed of in accordance with the law.

The present report is annexed to the promotional documentation of Marano Group and also constitutes the evaluation of management in accordance with the quality system and environment.